Upgrading Steamers Equipment & Build New Fermentation Room

—Before
The old steamer consumes a lot of energy
No steam piping design
Too much steam in the work workshop

Customer requirement: in the original workshop area, upgrade the steamers to increase production

—Then
The initial plan designed by TONGHENG engineers according to customer requirement
TONGHENG arranged engineers to foreign factories for on-site installation guidance

—After
Fermentation room–A lot of food can be fermented simultaneously

Steaming area–The workshop doesn’t have a lot of steam
The steaming time is shorterthan before

The customer is very satisfied

CONTACT US

contact-email
UWO

TONGHENG Hotel Equipment Co. Ltd.

We are always providing our customers with reliable products and considerate services.

    If you would like to keep touch with us directly, please go to contact us

    INQUIRY





      Online Service